Hydropower plant Raška (Serbia) processed by BIM methodology

Date: 10.01.2020


On the project of the Raška hydroelectric power plant (Serbia) we have actually verified that even a typical water management facility, which is the incoming hydroelectric power plant, can be created using the BIM methodology. Our team of designers has created a complex model, which incorporates very complex concrete structures, a digital terrain model, a substructure model including sump and anchorage, our own hydroelectric power plant and birch weir including air conditioning and electrotechnology with LOD 400 detail level.

In addition to BIM projects of standard buildings, we are able to process and commercially offer BIM methodology projects of water management structures such as weirs, dams, power plants, inflow objects, spillway overflows, etc.